Watchtower-Course-Project

Sprint 4 Planning Summary

Note: Like the Sprint 3 summary, this document was reconstructed after the fact from the Sprint 4 standup notes, the Sprint 4 retrospective, and the Sprint 4 decision log. Items not explicitly stated in those notes are marked. Sources: ../meetings/Sprint/4/, retrospectives/Retrospective 4.md.

Project

WatchTower (Group 09 — “Akatsuki”)

Sprint Goal

Build the final, single product (the version formerly called “Prototype 3”) by combining the best of Prototype 1 and 2, finishing a usable MVP dashboard with manager (executive) and developer views, and standing up hosted backend + frontend + demo that communicate across URLs.

What Changed From Sprint 3

Major Planned / Tracked Work

Reconstructed from the Sprint 4 standups and decision log:

Item Focus Issue
Landing page content + information architecture Frontend #60
Landing page UI with Login / Sign Up CTA Frontend #61
Static Login and Sign Up screens Frontend #62
Navigation polish (Back, Return Home, route consistency) Frontend #63
UI quality pass to reduce the AI-generated look Frontend #64
Dual dashboard modes (Executive + Developer views) Frontend #65
Single logo (remove redundant light/dark variants) Frontend #71
Research Clerk (auth) and Resend (email alerts) Backend/Research #78
Hosting on Render; split frontend/backend; .env for API keys Backend/Infra — (standup)
Migrate event storage SQLite → PostgreSQL Backend — (standup; ADR-0007)
Beacon API + Navigation Timing for capture Backend — (standup)

Focus Areas

Owners (from notes)

Risks / Blockers (from notes & retrospective)

Outcome / Status